  1. LISI VDR Move TO VDR2

    General Comments to LISI – Report JL943613 Rev. 1, March 8th 2018
    A more detailed description shall be provided in the report.

    1) Drawing of VDR 2 “NEW” Shop Floor “where” the heat treatment facilities and equipment’s are located and operating in the new area.

    2) Type ; Serial Number ; Main technical data etc. of the Heat treatment oven and facilities (data acquisition equipment) incl. Photos of all facilities used for the heat treatment process, shall be part of the report.

    3) Description of the process supervisory chain (chain of custody) (Überwachungskette

    4) Data of last calibration of all equipment’s /facilities use for this Heat treatment process.

    5) Quality acceptance test/ verification test report of heat treatment facilities after moving.

    6) Curves of all heat treatment curves shall be added.

    7) Tensile strength test and curves of tensile strength test shall be added.

    8) Discontinuities (para 4 of the report):
    What kind of inspection are performed. What results are achieved.

    Note:
    Due to the Aubert and Duval CRISES, please confirm that the tested “LowAlloy Steel” batch is not affected.

    A clear answer /comments to above questions should provide by LISI.