TCM 1 392-2-8 LISI Aerospace [Bestas] Gazemir (TR) EN3303-060

QAR: Click Here
Conditions for approval required by:  Julien Gauther

3 Replies to “TCM 1 392-2-8 LISI Aerospace [Bestas] Gazemir (TR) EN3303-060”

  1. On ASD-CERT website, EN/AS9100 certificate validity is expired (11/06/2019).

    On FAIR, for EN3303D060020, in column “Character. Designator”, it is written “minor” for all characteristics.
    How do we interpret “minor”?
    If we consider ISO7689, table 3, dimensional characteristics have not the same category of defects.
    Some dimensional characteristics are considered major with AQL = 1%, other dimensions are ranked as minor with AQL = 2,5% or 4%.
    So, for acceptance, do we have sample size for dimensional inspections as per ISO7689, tables 3 and 4? On FAI, sampling was done as per ANSI/ASQ Z1.4 general control level II-A and WI-SYS-30, but we do not have AQL applied.
    ISO7689 sampling (tables 3 and 4) is based on ISO2859-1, table II-A, single sampling, normal inspection. ISO2859-1 and ANSI/ASQ Z1.4 are really similar. From my point of view, this is the same way of sampling. Could you please confirm on your side?

    On MPI report for EN3303D060020, batch size is 191 bolts.
    32 bolts were MPI inspected.
    However, as per ISO7689, tables 3 and 4, AQL = 0,065% for discontinuities detection.
    Thus, in ISO7689 table 4, column AQL 0,065%, we have a down arrow marked against production batch size “151 to 280”. This down arrow means: “Use sampling plan below (sample size and Ac)”.
    In the case of sample size is equal to or greater than the batch size, a 100% inspection shall be performed.
    In this case, down arrow leads to sample 200 parts (with Ac = 0). So, since sample size (200) exceeds mfg batch size (191), a 100% MPI inspection should have been done instead of 32.
    This topic was already discussed in ASD-CERT Mechanical Workshop minutes (released in March 2019).
    These QTR was done before March 2019 since it is dated January 2019. This might explain why there is this sampling issue for MPI. If it is, could you please confirm that actions have been taken to apply right sampling plans?

    Many thanks in advance,
    Regards.
    Julien

    1. Please see “EN3303 comments.pdf” under the additional documents section.

      Best Regards

      Alper

  2. Thank you for replying. So, after reading your answers (additional documents section), the only remaining topic that needs to be clarified, for me, is sampling plans for non-destructive testing.
    This topic will be processed later.
    Best regards,
    Julien

Leave a Reply

Your email address will not be published. Required fields are marked *

Form restricted to registered, logged in users. Please return to the home page and use the Create Account option.