Flow charts: why do we have MPI operation step? Only FPI can be carried out on these Waspaloy bolts.
EN2935-060022:
FPI: in QTS, sample size is 200 parts, which is in line with prEN2582, tables 6 and 7.
However, in relevant test report, sample size is 80 parts. Could you please clarify?
Many thanks in advance
Best regards
Julien
Hi Julien,
Below are my responses to the comments:
Best regards
Nicolas Arlabosse
Flow charts: why do we have MPI operation step? Only FPI can be carried out on these Waspaloy bolts.
=> This is a translation error, it is not MPI but Eddy current 100% required by EN2582 §5.5.8
Please find attached the updated flow charts issue 2.
EN2935-060022:
FPI: in QTS, sample size is 200 parts, which is in line with prEN2582, tables 6 and 7.
However, in relevant test report, sample size is 80 parts. Could you please clarify?
=> This is a typo error in the QTS, the sampling was indeed done on 80 pieces instead of 200. This is a batch closed in November 2018 (reissued without any changes on 05/01/2023 for the renewal file) that’s why the sampling was not compliant. Attached is the updated QTS issue 2 with the 80 piece sampling.
Many thanks in advance
Best regards
Julien
Hi Nicolas,
Many thanks for your speed!
I am happy with all your answers, so, approved from my side.
Best regards
Julien